Journal cover Journal topic
Journal of Sensors and Sensor Systems An open-access peer-reviewed journal
Journal topic

Journal metrics

CiteScore value: 2.9
CiteScore
2.9
SNIP value: 1.056
SNIP1.056
IPP value: 1.38
IPP1.38
SJR value: 0.361
SJR0.361
Scimago H <br class='widget-line-break'>index value: 13
Scimago H
index
13
h5-index value: 13
h5-index13
Download
Short summary
Test centres supplying accuracy tests for instrument transformers must provide measurement uncertainties for their quality management. In this work, ratio error and phase displacement of instrument transformers are discussed. The traceability to the national standards of PTB, the attainable uncertainty and the permitted error limits of test equipment for testing instrument transformers are presented. An example of an uncertainty budget for a current transformer of the class 0,2 S is given.
Articles | Volume 7, issue 1
J. Sens. Sens. Syst., 7, 339–347, 2018
https://doi.org/10.5194/jsss-7-339-2018

Special issue: Evaluating measurement data and uncertainty

J. Sens. Sens. Syst., 7, 339–347, 2018
https://doi.org/10.5194/jsss-7-339-2018

Regular research article 07 May 2018

Regular research article | 07 May 2018

Test equipment and its effect on the calibration of instrument transformers

Enrico Mohns and Peter Räther

Viewed

Total article views: 3,187 (including HTML, PDF, and XML)
HTML PDF XML Total BibTeX EndNote
2,766 387 34 3,187 65 62
  • HTML: 2,766
  • PDF: 387
  • XML: 34
  • Total: 3,187
  • BibTeX: 65
  • EndNote: 62
Views and downloads (calculated since 07 May 2018)
Cumulative views and downloads (calculated since 07 May 2018)

Viewed (geographical distribution)

Total article views: 2,504 (including HTML, PDF, and XML) Thereof 2,405 with geography defined and 99 with unknown origin.
Country # Views %
  • 1
1
 
 
 
 
Latest update: 15 May 2021

Publications Copernicus
Download
Short summary
Test centres supplying accuracy tests for instrument transformers must provide measurement uncertainties for their quality management. In this work, ratio error and phase displacement of instrument transformers are discussed. The traceability to the national standards of PTB, the attainable uncertainty and the permitted error limits of test equipment for testing instrument transformers are presented. An example of an uncertainty budget for a current transformer of the class 0,2 S is given.
Citation